Windsor Leisure Centre cuts carbon emissions by 800 tonnes with heat pumps and solar panels
sloughobserver.co.ukWindsor Leisure Centre has completed a major low-carbon retrofit, replacing gas boilers with air source heat pumps and installing over 580 solar panels. The project, funded by the Public Sector Decarbonisation Scheme and the local council's Carbon Offset Fund, is expected to cut carbon emissions by more than 800 tonnes per year and save up to 100,000 pounds annually in utility costs. Without the upgrades, the centre risked closure due to failing infrastructure. The installation includes a Net Zero Pod with air source heat pumps, new energy-efficient air handling units, and upgrades to the pool filtration system and building management system. The solar array generates around 179,000 kWh of renewable electricity annually. The total project cost was 5.4 million pounds, funded through the Department for Energy Security and Net Zero's decarbonisation programme. The council says the work makes the facility more comfortable and future ready for residents.
