A new peer-reviewed study in Nature Sustainability estimates that 403 U.S. hyperscale data centers used between 68 and 99 terawatt-hours of electricity from May 2024 to April 2025, roughly 1.8% of national consumption. That is nearly four times the annual electricity sales of the Los Angeles Department of Water and Power. The study finds about 54% of that power came from fossil fuels, with natural gas at 38% and coal at 15%, producing an estimated 25.7 million metric tons of CO2. Virginia, Oregon, Ohio, and Iowa account for more than half of the studied electricity use, signaling where grid strain and emissions are most concentrated. Researchers used satellite imagery and EPA regional power plant data to estimate facility-level consumption and emissions. The authors note that 2026 figures are likely already higher, but precise current numbers remain unmeasured. For carbon markets and grid planners, this points to a growing need for renewable procurement, storage, and better tracking of data center power sourcing to avoid locking in fossil-heavy demand.
