Teejay Lanka invests USD 5.2 million in solar and biomass to cut carbon and energy costs
knittingindustry.comTeejay Lanka, a Sri Lankan knitted fabric manufacturer, is spending over USD 5.2 million on rooftop solar and biomass projects to reduce emissions and improve energy cost competitiveness. The solar installation will add 7.2 MW capacity, while the biomass boiler replaces coal, cutting fuel costs by 25-30% and facility emissions by 49%. The company targets a 42% reduction in Scope 1 and 2 greenhouse gas emissions by 2030, with both projects expected to be operational by September 2026. The investments are part of Teejay's Abhivarah 2030 strategy and are validated by the Science Based Targets initiative. Scope 3 emissions remain a challenge, and Teejay is expanding supplier engagement and circularity efforts. The case shows how industrial manufacturers in developing economies can use renewable energy to strengthen both sustainability and long-term competitiveness.
