Star Refrigeration upgraded the frozen storage system at the DHL Wetherspoon distribution centre in Daventry using a low-charge ammonia Azanefreezer 2.0. The project reduced annual electricity use by over 600,000kWh and cut carbon emissions by 123 tonnes. The upgrade replaced an aging 2004 refrigeration plant, eliminating the need for water treatment and reducing the ammonia charge to 220kg. This shift improves operational safety while lowering annual running costs by nearly 200,000 pounds.
