Selar's Captain Arctic Wind and Solar Ship Reaches 75% Construction Milestone for Late 2026 Arctic Debut
thetraveler.orgSelar Expeditions has announced that its Captain Arctic vessel, a near-zero carbon expedition ship combining wind propulsion with solar sails, has reached 75% construction completion. The 36-guest ship is being built at the CNOI yard in Mauritius and is expected to enter Arctic service in late 2026, targeting a 90% reduction in carbon emissions compared to conventional cruise ships operating in polar regions. The Captain Arctic features five rigid sails with integrated solar panels covering about 2,000 square meters, designed to generate electricity for hotel loads and assist propulsion. The vessel's small scale and micro cruise model aim to minimize environmental impact in sensitive Arctic ecosystems while offering flexible itineraries based on ice and wildlife conditions. With the remaining 25% of construction focused on interior outfitting and systems integration, the project is being watched as a test case for low-impact polar cruising. The ship's performance in real-world conditions will determine whether this blend of wind, solar, and small-scale operations can offer a replicable model for decarbonizing expedition travel.
