Scottish Water has deployed 372 solar panels at the Lawhead Treated Water Pumping Station in Penicuik. The system is expected to generate 0.15GWh of green electricity annually, covering about 27% of the facility's total energy needs. The project aims to reduce operational costs and carbon emissions by approximately 28 tonnes of CO2 equivalent per year. Surplus energy will be exported to the national grid, supporting the utility's goal of reaching net zero by 2040.
