A new simulation study assesses a 503.5 kWp rooftop solar array on a garment factory in Chittagong, Bangladesh. The PVsyst model forecasts 713 MWh of annual generation, a 9.9 year payback period, and a levelized cost of electricity of $0.05/kWh. Over 25 years, the system would avoid roughly 8,348 metric tons of CO2 versus grid power, which is heavily fossil-fuel based in Bangladesh. The research uses historical utility data from the NHT Fashion building in the Chittagong Export Processing Zone. It accounts for real equipment specs, meteorological data, and losses like soiling and degradation. The authors note limitations: no hourly load profiles, no field validation, and cyclone risk on the coast. The findings offer a practical path for industrial rooftop solar in a country where grid renewables are under 1%.
