NESI and Vulcan Energy Build Low-Carbon Lithium Plant in Germany
discoveryalert.com.auVulcan Energy is constructing a Central Lithium Plant in Frankfurt using NESI's NORSCAND electrolysis technology. The facility aims to produce 24,000 tonnes of battery-grade lithium hydroxide annually, supporting approximately 500,000 electric vehicles per year with a low-carbon footprint. By using electrochemical conversion instead of traditional chemical reagents, the plant reduces chemical waste and carbon intensity. The project integrates geothermal brine extraction with renewable energy to create a vertically integrated, sustainable battery material supply chain within Europe.
