NEAS installs rapid EV chargers at North Tees hospital as part of £2.2m NHS fleet charging push
bbc.co.ukNorth East Ambulance Service has switched on a rapid EV charger at University Hospital of North Tees, part of a wider push to cut carbon from NHS transport. The dual charger lets ambulances top up while operating in Teesside, and NEAS says it supports the service's move toward electric vehicles and the NHS net zero target. The new unit is one piece of a larger rollout. Through £2.2m from the Department of Health and Social Care, NEAS is installing 46 high-powered charging ports across seven ambulance stations in Alnwick, Backworth, Bishop Auckland, Blucher, Coulby Newham, Consett and Stockton. Total capacity will reach 1,250kW, enough to bring emergency vehicles from empty to 80% charge in roughly 15 minutes. The infrastructure is arriving before the electric ambulances themselves. NEAS currently runs more than 600 vehicles from 63 stations, and it attended 442,168 incidents in 2025/26. Charging first, vehicles later is a sensible order, but the carbon payoff depends on how quickly the fleet actually goes electric.
