Inkoh Opens Fifth Biochar Site in Switzerland With NGE Reactors and Cula Data Systems
carbonherald.comSwiss biochar producer Inkoh has opened a new headquarters and production site in Landquart, Switzerland. It is the company's fifth biochar facility and the first to run on T:CRACKER reactors from Next Generation Elements. The site converts waste biomass into biochar via pyrolysis and supplies products for low-CO2 concrete, agricultural substrates, and animal feed. The facility uses data systems from Cula Technologies to track biomass deliveries, moisture readings, big bag labeling, and plant KPIs. That data flows directly into Puro.earth credit issuance, so reporting is audit-ready without duplicate spreadsheets. Inkoh plans to add electricity, water, and heat meters to get emissions and efficiency data from metered sources rather than manual assembly. For anyone following biochar carbon removal, this is an example of scaling operations and MRV together rather than bolting on reporting after commissioning.
