Henkel cuts 11,300 tons of CO2 at Kurkumbh plant with electrification and renewable energy
sahyadristartups.comHenkel has reached carbon neutral production at its Kurkumbh site in India by replacing furnace oil heaters with electric heating and switching to 100% renewable electricity. The change eliminates both Scope 1 and Scope 2 emissions and cuts roughly 11,300 tons of CO2 equivalent per year. A similar project at its Gebkim plant in Turkey saves another 956 tons annually. The company says it is systematically removing fossil fuels from its adhesive manufacturing operations and moving to electrified processes powered by renewables. These site level results show how industrial decarbonization can work when you combine efficiency upgrades with clean power procurement. The Kurkumbh retrofit included heat load optimization and new high efficiency heat exchangers alongside the electrical upgrades.
