Green Party election wins push Edmonton incinerator rethink over carbon and cost concerns
hamhigh.co.ukThe May elections gave the Green Party control of three north London councils, shifting the balance on the North London Waste Authority board. Campaigners are now pushing the NLWA to pause and review plans for a 700,000-tonne waste incinerator in Edmonton, arguing the project is out of step with current waste levels, net zero targets, and available alternatives like heat pumps and mixed-waste sorting. Critics point to the plant's high carbon emissions, rising construction costs, and the inclusion of incineration in the UK Emissions Trading Scheme from 2028 as growing financial risks. North London's recycling rate remains under 30%, far below the 50% target set by the NLWA itself. The article details the key arguments for a rethink and links to the Stop the Edmonton Incinerator campaign.
