EnergyPathways targets 2029 revenues from Barrow low-carbon hydrogen and graphite plant
share-talk.comEnergyPathways (AIM: EPP) said it is moving faster on a low-carbon hydrogen and graphite production facility at Barrow-in-Furness, with first revenues targeted by 2029. The project uses methane splitting to turn natural gas into hydrogen and solid graphite, so the carbon is captured as a product instead of emitted as CO2. The company says the development could work without government subsidies and may start earlier if engineering and commercial work line up. Graphite is a critical mineral in the UK, and the country currently imports all of it. EnergyPathways wants to start with industrial buyers in tyres, metallurgy, concrete and asphalt, then move toward higher-grade material for EV batteries and advanced tech. A site for 20,000 tonnes per year has been identified in Barrow, and the company is talking to customers and investors. None of this is locked in yet. The 2029 target depends on land, engineering, funding and binding offtake agreements, none of which have been announced. The project is part of the wider MESH energy storage and hydrogen plan, but the company is presenting the graphite and hydrogen line as a standalone route to revenue.
