Derbyshire carbon capture pipeline: safety risks 'infinitesimally small', says Peak Cluster chief
buxtonadvertiser.co.ukPeak Cluster, the group behind a proposed carbon capture pipeline through Derbyshire, says the safety risks are 'infinitesimally small'. The £59.6m scheme would carry CO2 from cement and lime plants in Buxton, the Hope Valley, and Staffordshire to storage under the Irish Sea. The government has pledged £28.6m toward the project. Opponents, including Derbyshire County Council and the Action Against Carbon Capture Storage campaign, have raised concerns about pipeline safety, disruption to farmland, and impacts on the Peak District. They point to a CO2 pipeline rupture in Mississippi in 2020. Peak Cluster says it will use lower pressure than that line, follow UK pipeline regulations, and restore land after construction. The latest consultation runs from November 12 to December 18. Peak Cluster expects to submit a Development Consent Order application in 2027. A further consultation on detailed design is planned for summer 2027.
