China Starts Work on 50MW Supercritical CO2 and Molten Salt Storage at Shandong Coal Plant
gasworld.comChina has begun construction on an industrial-scale energy project combining supercritical CO2 power generation with molten salt storage at the Bajiao coal plant in Yantai, Shandong. The first phase includes a 50MW sCO2 unit and 100MW molten salt storage with 400MWh capacity, designed to shift surplus electricity from coal units to peak demand periods. It is expected to be commissioned next year. The project uses CO2 in a closed-loop supercritical cycle to drive a turbine, which is more compact and faster-responding than conventional steam cycles and does not require water. The molten salt stores heat from surplus electricity, which can be converted back to power later. This is a step toward longer-duration storage and grid flexibility, and it follows China's earlier sCO2 unit at a steel plant in Guizhou. This demonstration could inform how existing coal plants integrate storage and CO2-based power cycles, though round trip efficiency and costs remain to be seen.
